The Chedi Spa & Gym

The Chedi Spa & Gym

Andermatt | Swizerland

2013 | ID Denniston

For this spectacular spa Interna has been selected as main contractor and supplied turnkey all the interior construction works along with all the millwork and furnishings for the more than 2000 square meters of the structure.
The complete fit out of the thermal and wellness centre, with the fitness area, the spectacular 15 metre swimming pool, the comfortable treatment areas and the wide relax area, engaged Interna for more than ten months. A highly specialized team installed plasterboards and floorings, ceilings and walls and dealt successfully with the challenge posed by the dimensions and forms of the spaces: very high ceilings and a preponderance of curved walls to be covered with rather unyielding materials such as stone.
All cladding materials, the wood essences of the furnishings, the fabrics and leathers have been treated in compliance with the strict ruling regarding public spas, meeting all the health and security requirements for spaces and items and all the requirements to guarantee their endurance and inalterability in time.